Standard operating procedures for contractors

SOPs for construction companies: the eight to write first.

A standard operating procedure lists the steps. What goes wrong in a construction company is usually the judgment call inside a step. Here are eight procedures worth writing first, the judgment call hidden in each, and one written out in full.

The list

Eight procedures, and the judgment call in each.

The steps are the easy part to write. The third column is the part that lives in someone's head, and it is what a new hire or an AI assistant gets wrong.

  1. 01

    Lead intake and site visit

    CoversQualifying questions, the visit checklist, photos.

    Judgment callWhich jobs get an estimate at all.

  2. 02

    Estimating and bid review

    CoversTakeoff, cost book, subcontractor quotes, review.

    Judgment callHow much contingency this job carries.

  3. 03

    Contract and preconstruction

    CoversContract, deposit, permits, schedule, selections.

    Judgment callWhat must be decided before the start date.

  4. 04

    Change orders written out below

    CoversRequest, pricing, signature, schedule.

    Judgment callWhat to do when the client wants it done today.

  5. 05

    Subcontractor management

    CoversScope sheets, insurance, scheduling, payment.

    Judgment callWhen to replace a subcontractor mid-job.

  6. 06

    Daily logs and site documentation

    CoversWhat the log holds, photos, deliveries, visitors.

    Judgment callWhat gets photographed before it is covered.

  7. 07

    Hidden conditions

    CoversStop, document, notify, price.

    Judgment callWhat is the client's cost and what is ours.

  8. 08

    Closeout and warranty

    CoversPunch list, final payment, warranty requests.

    Judgment callWhat is warranty and what is wear.

A worked example

Change orders, written out.

Purpose, trigger, steps, exceptions, owner. That is the whole format. It fits on one page, and the exceptions section is the part worth the most.

This is an example to show the format and the level of detail. The dates, limits and roles are placeholders. Replace them with what your company actually does.

sops/change-orders.md
# Change orders

Owner: Project manager. The owner approves any change priced below the standard markup.
Last reviewed: <date>

## Purpose
Build what the client asks for without eating the cost or arguing about it at the end.

## Trigger
The client, the designer or a site condition calls for work that is not in the contract.

## Steps
1. Stop work on the affected area and note the request in the daily log.
2. The project manager describes the change in writing, with photos or a sketch.
3. Price the change from the cost book and subcontractor quotes, with the change-order markup.
4. State the effect on the schedule, in days.
5. The client signs the change order before any of the work is done.
6. Add the change to the next draw and to the schedule.

## Exceptions
- A safety or code issue that cannot wait: make it safe, document it, and price it the same day.
- A no-cost swap of equal materials: still written and signed, at zero dollars.
- The client approves out loud on site: the work waits for the signature.

The method

How to write the other seven.

  1. 01

    Start from a real case

    Ask the person who does it to walk through the last time it happened. People describe what they actually did more accurately than what they would do.

  2. 02

    Write one action per step

    Put the steps in the order they happen, and say who does each one. If a step has "and" in it, it is probably two steps.

  3. 03

    Ask "when is that not true?"

    Ask it after every step, and ask it twice. The second answer is usually the exception nobody has written down.

  4. 04

    Name the trigger and one owner

    A procedure with no trigger never starts, and one with two owners has none. Give each a single name or role.

  5. 05

    Test it on someone new

    Hand it to a person who has never done the job, or paste it into an AI assistant and ask three real questions. Every wrong answer points at a gap.

  6. +

    Point to the rule, do not repeat it

    Prices, approval limits and policies show up in many procedures. Keep each in one knowledge file and have the SOP refer to it. See the six files for construction companies →

Free starter kit

Take the list and the example with you.

The starter kit for construction companies has this list and the worked example as plain-text files, plus the six knowledge templates the procedures point to and an interview guide for getting the details out of the person who knows.

Get the starter kit for construction companies

The SOP list, the worked example, six templates and an interview guide.

Free. The download opens on the next page. No newsletter.

Questions

SOPs for construction companies, in short

What is an SOP for a construction company?

A standard operating procedure is a written description of one recurring process, such as lead intake and site visit or change orders. It says what triggers the process, the steps in order, who owns it, and what to do when the usual steps do not apply.

Which SOPs should a construction company write first?

Start where a mistake costs the most, or where only one person knows how it is done. The eight on this page are a starting list, and change orders is written out in full as a model for the rest.

Can AI write our SOPs?

It can turn a recorded walkthrough into a clean draft quickly, and that is a good use of it. It cannot know your exceptions, your limits, or who decides. Those come from the person who does the work, which is why each procedure here names the judgment call to capture.

What is the difference between an SOP and a knowledge file?

An SOP describes one process from trigger to finish. A knowledge file holds a rule that several processes share, such as your prices or who approves an exception. A good SOP points to the file instead of repeating the rule, so the rule only has to be updated in one place.

Write one procedure this week.

The starter kit for construction companies: the SOP list, a worked example, six templates and an interview guide.

Free. The download opens on the next page. No newsletter.